Construction of a biogas plant - BT-Spannschloss® (turnbuckle)

In Jemgum a 75kW biogas plant was commissioned. In this project the BT-Spannschloss® was used to connect the prefabricated elements. The BT-Spannschloss® made a fast and problem-free assembly possible with an average assembly time of only 20min per element. This shortened the assembly time from three days to one day. The BT-Spannschloss® was able to meet the high static requirements without any problems. Just 2 months later, the system was put into operation by its owner.